Part of the 10 planning levels: Validation of the cutover(i) Phase of the 5-phase model: Execution of the production transition; includes technical switchover and operational implementation. (ii) Selective transition of a project to the production environment. (iii) Production transition... logic through tests, simulations, and BCM measures.

